The Incident Command System (ICS) is "a systematic tool used for the command, control, and coordination of emergency response" according to the United States Federal Highway Administration.[1] A more detailed definition of an ICS according to the United States Center for Excellence in Disaster Management & Humanitarian Assistance is "a set of personnel, policies, procedures, facilities, and equipment, integrated into a common organizational structure designed to improve emergency response operations of all types and complexities. ICS is a subcomponent of the National Incident Management System (NIMS), as released by the U.S. Department of Homeland Security in 2004."[2] An ICS is based upon a flexible, scalable response organization providing a common framework within which people can work together effectively. These people may be drawn from multiple agencies that do not routinely work together, and ICS is designed to give standard response and operation procedures to reduce the problems and potential for miscommunication on such incidents. ICS has been summarized as a "first-on-scene" structure, where the first responder of a scene has charge of the scene until the incident has been declared resolved, a more qualified responder arrives on scene and receives command, or the Incident Commander appoints another individual Incident Commander.
Contents |
ICS consists of a standard management hierarchy and procedures for managing temporary incident(s) of any size. ICS procedures should be pre-established and sanctioned by participating authorities, and personnel should be well-trained prior to an incident.
ICS includes procedures to select and form temporary management hierarchies to control funds, personnel, facilities, equipment, and communications. Personnel are assigned according to established standards and procedures previously sanctioned by participating authorities. ICS is a system designed to be used or applied from the time an incident occurs until the requirement for management and operations no longer exist.
ICS is interdisciplinary and organizationally flexible to meet the following management challenges:
Part of a series on Wildland Firefighting |
|||
---|---|---|---|
Main articles | |||
Tactics & Equipment | |||
Aerial firefighting · Controlled burn · Firebreak · Fire trail · Fire lookout tower · Fire-retardant gel · Fire fighting foam · Fire retardant · Helicopter bucket · Driptorch |
|||
Personnel | |||
Handcrew · Hotshots · Helitack · Smokejumper · Rappeller · Engine crew |
|||
Lists | |||
ICS was originally developed in the 1970s during massive wildfire suppression efforts in California and following a series of catastrophic wildfires in California's urban interface. Property damage ran into the millions, and many people died or were injured. Studies determined that response problems often related to communication and management deficiencies rather than lack of resources or failure of tactics. ICS fell under California's Standardized Emergency Management System or SEMS.[3][4] In 2003, SEMS went national with the passage of Homeland Security Presidential Directive 5 (HSPD5)mandating all federal, state, and local agencies use NIMS or the National Incident Management System to manage emergencies in order to receive federal funding.
Weaknesses in incident management were often due to:
Emergency managers determined that the existing management structures — frequently unique to each agency — did not scale to dealing with massive mutual aid responses involving dozens of distinct agencies and when these various agencies worked together their specific training and procedures clashed. As a result, a new command and control paradigm was collaboratively developed to provide a consistent, integrated framework for the management of all incidents from small incidents to large, multi-agency emergencies.
In the United States, ICS has been tested by more than 30 years of emergency and non-emergency applications. All levels of government are required to maintain differing levels of ICS training and private sector organizations regularly use ICS for management of events. ICS is widespread in use from law enforcement to every-day business, as the basic goals of clear communication, accountability, and the efficient use of resources are common to incident and emergency management as well as daily operations. ICS is mandated by law for all Hazardous Materials responses nationally and for many other emergency operations in most states. In practice, virtually all EMS and disaster response agencies utilize ICS, in part after the United States Department of Homeland Security mandated the use of ICS for emergency services throughout the United States as a condition for federal preparedness funding. As part of FEMA's National Response Plan (NRP), the system was expanded and integrated into the National Incident Management System (NIMS).
ICS is widely used in the United Kingdom and the United Nations recommended the use of ICS as an international standard. ICS is also used by agencies in Canada.[5]
New Zealand has implemented a similar system, known as the Coordinated Incident Management System, Australia has the Australasian Inter-Service Incident Management System and British Columbia, Canada, has BCERMS developed by the Provincial Emergency Program.
In Brazil, ICS is also used by The Fire Department of the State of Rio de Janeiro(CBMERJ) in every emergency or large scale events.
Incidents are defined within ICS. as unplanned situations necessitating a response. Examples of incidents may include:
Events are defined within ICS as planned situations. Incident command is increasingly applied to events both in emergency management and non-emergency management settings. Examples of events may include:
Each individual participating in the operation reports to only one supervisor. This eliminates the potential for individuals to receive conflicting orders from a variety of supervisors, thus increasing accountability, preventing freelancing, improving the flow of information, helping with the coordination of operational efforts, and enhancing operational safety. This concept is fundamental to the ICS chain of command structure.[6]
Individual response agencies previously developed their protocols separately, and subsequently developed their terminology separately. This can lead to confusion as a word may have a different meaning for each organization.
When different organizations are required to work together, the use of common terminology is an essential element in team cohesion and communications, both internally and with other organizations responding to the incident.
An incident command system promotes the use of a common terminology and has an associated glossary of terms that help bring consistency to position titles, the description of resources and how they can be organized, the type and names of incident facilities, and a host of other subjects. The use of common terminology is most evident in the titles of command roles, such as Incident Commander, Safety Officer or Operations Section Chief.[6]
Incidents are managed by aiming towards specific objectives. Objectives are ranked by priority; should be as specific as possible; must be attainable; and if possible given a working time-frame. Objectives are accomplished by first outlining strategies (general plans of action), then determining appropriate tactics (how the strategy will be executed) for the chosen strategy.[6]
Incident Command structure is organized in such a way as to expand and contract as needed by the incident scope, resources and hazards. Command is established in a top-down fashion, with the most important and authoritative positions established first. For example, Incident Command is established by the first arriving unit.
Only positions that are required at the time should be established. In most cases, very few positions within the command structure will need to be activated. For example, a single fire truck at a dumpster fire will have the officer filling the role of IC, with no other roles required. As more trucks get added to a larger incident, more roles will be delegated to other officers and the Incident Commander (IC) role will probably be handed to a more-senior officer.
Only in the largest and most complex operations would the full ICS organization be staffed.[6] Conversely, as an incident scales down, roles will be merged back up the tree until there is just the IC role remaining.
To limit the number of responsibilities and resources being managed by any individual, the ICS requires that any single person's span of control should be between three and seven individuals, with five being ideal. In other words, one manager should have no more than seven people working under them at any given time. If more than 7 resources are being managed by an individual, then they are being overloaded and the command structure needs to be expanded by delegating responsibilities (e.g. by defining new sections, divisions, or task forces). If fewer than three, then the position's authority can probably be absorbed by the next highest rung in the chain of command.[6]
Coordination on any incident or event is possible and effective due to the implementation of the following concepts:
Incident action plans ensure that everyone is working in concert toward the same goals set for that operational period by providing all incident supervisory personnel with direction for actions to be taken during the operational period identified in the plan. Incident Action Plans provide a coherent means of communicating the overall incident objectives for both operational and support activities. They include measurable strategic objectives to be achieved in a time frame called an Operational Period. They may be verbal or written except for hazardous material incidents where it must be written,[7] and are prepared by the Planning Section.
The consolidated IAP is a very important component of the ICS that reduces freelancing and ensures a coordinated response. At the simplest level, all Incident Action Plans must have four elements:
Comprehensive resource management is a key management principle that implies that all assets and personnel during an event need to be tracked and accounted for. It can also include processes for reimbursement for resources, as appropriate. Resource management includes processes for:
Comprehensive resource management ensures that visibility is maintained over all resources so they can be moved quickly to support the preparation and response to an incident, and ensuring a graceful demobilization. It also applies to the classification of resources by type and kind, and the categorization of resources by their status.
T-Cards (ICS 219, Resource Status Card) are most commonly used to track these resources. The cards are placed in T-Card racks located at an Incident Command Post for easy updating and visual tracking of resource status.
The use of a common communications plan is essential for ensuring that responders can communicate with one another during an incident. Communication equipment, procedures, and systems must operate across jurisdictions (interoperably). Developing an integrated voice and data communications system, including equipment, systems, and protocols, must occur prior to an incident.
Effective ICS communications include three elements:
At the ICS 200 level, the function of Information and Intelligence is added to the standard ICS staff as an option. This role is unique in ICS as it can be arranged in multiple ways based on the judgement of the Incident Commander and needs of the incident. The three possible arrangements are:
At the ICS 400 level, the focus is on large, complex incidents. Topics covered include the characteristics of incident complexity, the approaches to dividing an incident into manageable components, the establishment of an "Area Command", and MultiAgency Coordination (MAC).
Some of the options for dividing an incident into components include the following:
While the dual OSC and LSC approaches are taught in the FEMA curriculum, most practitioners of ICS disapprove of this expansion technique.
ICS is organized by levels, with the supervisor of each level holding a unique title (e.g. only a person in charge of a Section is labeled "Chief"; a "Director" is exclusively the person in charge of a Branch). Levels (supervising person's title) are:
ICS uses a standard set of facility nomenclature. ICS facilities include: Pre-Designated Incident Facilities: Response operations can form a complex structure that must be held together by response personnel working at different and often widely separate incident facilities. These facilities can include:
Each facility has unique location, space, equipment, materials, and supplies requirements that are often difficult to address, particularly at the outset of response operations. For this reason, responders should identify, pre-designate and pre-plan the layout of these facilities, whenever possible.
On large or multi-level incidents, higher-level support facilities may be activated. These could include:
ICS uses a standard set of equipment nomenclature. ICS equipment include:
The "type" of resource describes the size or capability of a resource. For instance, a 50 kW (for a generator) or a 3-ton (for a truck). Types are designed to be categorized as "Type 1" through "Type 5" formally, but in live incidents more specific information may be used.
The "kind" of resource describes what the resource is. For instance, generator or a truck. The "type" of resource describes a performance capability for a kind of resource for instance,
In both type and kind, the objective must be included in the resource request. This is done to widen the potential resource response. As an example, a resource request for a small aircraft for aerial reconnaissance of a search and rescue scene may be satisfied by a National Guard OH-58 Kiowa helicopter (Type & Kind: Rotary-wing aircraft, Type II/III) or by a Civil Air Patrol Cessna 182 (Type & Kind: Fixed-wing aircraft, Type I). In this example, requesting only a fixed-wing or a rotary-wing, or requesting by type may prevent the other resource's availability from being known.
A role of responsibility can be transferred during an incident for several reasons: As the incident grows a more qualified person is required to take over as Incident Commander to handle the ever-growing needs of the incident, or in reverse where as an incident reduces in size command can be passed down to a less qualified person (but still qualified to run the now-smaller incident) to free up highly-qualified resources for other tasks or incidents. Other reasons to transfer command include jurisdictional change if the incident moves locations or area of responsibility, or normal turnover of personnel due to extended incidents. The transfer of command process always includes a transfer of command briefing, which may be oral, written, or a combination of both.